Back River Road:  The work that has been completed is on a small segment of the road from the Dunkin Donuts near SSR to Tirrell Road.  Ditching work, some tree removal and trimming, remove several damaged areas of pavement and repave, and replace all pavement markings.  The compacted shoulder gravel will be installed this fall.  Project completion is anticipated in fall of 2025.
County Road:  Ditching work, some tree removal, and trimming, remove several damaged areas of pavement and repave, overlayed the entire segment between Back River and County Road with 1.5” of asphalt, and reinstalled pavement markings.  Finally, installation of compacted shoulder gravel, is anticipated to happen in fall of 2024.
Patten Road:  The completed work was performed is on a small segment of the road from the intersection of County Road to the pavement joint near the stream crossing at the bottom of the Hill near Lynn Drive.  Removed several damaged areas of pavement and repave, and installed 1.5” of new asphalt, and replaced all pavement markings.  Project is complete.

 

DJI_20240903114945_0184_D.JPG
bottom of page